Hide
Filter

Filter

Contact information is available only for registered users
The construction of the 1,600 km long pipeline serves the purpose of connecting the two countries (Mozambique and the...
Description of the project, TIPark. The area of Tula Industrial Park is 1,386,000 sq.m. The territory of the Park will...
To build a very modern fully automated 2050 Technology plant. to produce high efficient bifacial solar panels
Mostly untouched, a newly discovered nickel belt of similar size and cost plus the exact same geology as Canada's...
To create renewable energy, gas driven electric power station which is compatible with the department of Energy in...
4 Greenfield projects along with a structure with proven and historically mined or drilled deposits - 3 of which are...
Creation in the territory of Africa, in one of the free port areas (Tanzania, Mozambique, Namibia), an assembly shop...
A large magnetite deposit containing: Vanadium, Cobalt and platinum moons. Convenient infrastructure, water on the...
Alluvial gold. Extremely rich parts. Moderately wealthy for the most part. Diamonds are possible
Brownfield is a large mine with distributed ore bodies. 13 million tons of sludge containing confirmed for further...
Partially drilled carbonatite with JORC exploration resource showed that reserves are less than 3% of the total field...
The technology is based on the concept of fast high temperature pyrolysis decomposition of wastes. The proposed system...
We are looking for the opportunity to place a contract manufacturing of jewelry from Qatari customers. Supply of...
We are looking for an option to enter the Qatar Market, in particular, at Qatar Petroleum, QatarGas.